A radar project is in the processes of being authorized, and you have been requested to develop a schedule. Assume that
Posted: Fri Jul 01, 2022 9:06 am
A radar project is in the processes of being authorized, and youhave been requested to develop a schedule. Assume that the startdate is 12 July 2021 with a normal schedule (i.e., five-day workweeks Mon-Fri) and no holidays will be taken. An activity definedas a 5 week activity requires 5 work weeks x 5 work days per workweek = 25 work days. However, when calculating a completiondate, a 5 week activity equates to 5 calendar weeks x 7 calendardays per calendar week = 35 calendar days.
A table with calendar dates for start and end of each activityand the project completion date using the most likely duration.
No. Task Name 1 2 3 Radar Project Authorized Antenna Design Antenna H/W Design 4 Antenna S/W Design Radar Interface Unit Design 5 6 7 8 9 10 11 Radar Interface H/W Design 12 Radar Interface S/W Design Receiver Design Optimistic 0 3 6 12 4 5 Receiver Hardware Design Receiver Software Design 6 Design Review 3 Radar Material Acquisition 13 Prototype Manufacturing 12 3 5 8 6 Most Likely 0 5 8 15 5 7 14 5 7 8 4 10 9 Pessimistic Predecessors 0 5 10 20 6 7 16 7 9 10 6 12 12 1 FS 2 SS+5 (lag) 2 FS+5 (lag) 10 FS, 9FS, 4FS, 3 FS 5 FS 5 FS 1 FS 8 FS 8 SS 6 FS, 7FS 11 FS 12 FS
A table with calendar dates for start and end of each activityand the project completion date using the most likely duration.
No. Task Name 1 2 3 Radar Project Authorized Antenna Design Antenna H/W Design 4 Antenna S/W Design Radar Interface Unit Design 5 6 7 8 9 10 11 Radar Interface H/W Design 12 Radar Interface S/W Design Receiver Design Optimistic 0 3 6 12 4 5 Receiver Hardware Design Receiver Software Design 6 Design Review 3 Radar Material Acquisition 13 Prototype Manufacturing 12 3 5 8 6 Most Likely 0 5 8 15 5 7 14 5 7 8 4 10 9 Pessimistic Predecessors 0 5 10 20 6 7 16 7 9 10 6 12 12 1 FS 2 SS+5 (lag) 2 FS+5 (lag) 10 FS, 9FS, 4FS, 3 FS 5 FS 5 FS 1 FS 8 FS 8 SS 6 FS, 7FS 11 FS 12 FS