A radar project is in the processes of being authorized, and you have been requested to develop a schedule. Assume that

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A radar project is in the processes of being authorized, and you have been requested to develop a schedule. Assume that

Post by answerhappygod »

A radar project is in the processes of being authorized, and youhave been requested to develop a schedule. Assume that the startdate is 12 July 2021 with a normal schedule (i.e., five-day workweeks Mon-Fri) and no holidays will be taken. An activity definedas a 5 week activity requires 5 work weeks x 5 work days per workweek = 25 work days. However, when calculating a completiondate, a 5 week activity equates to 5 calendar weeks x 7 calendardays per calendar week = 35 calendar days.
A table with calendar dates for start and end of each activityand the project completion date using the most likely duration.
A Radar Project Is In The Processes Of Being Authorized And You Have Been Requested To Develop A Schedule Assume That 1
A Radar Project Is In The Processes Of Being Authorized And You Have Been Requested To Develop A Schedule Assume That 1 (40.38 KiB) Viewed 67 times
No. Task Name 1 2 3 Radar Project Authorized Antenna Design Antenna H/W Design 4 Antenna S/W Design Radar Interface Unit Design 5 6 7 8 9 10 11 Radar Interface H/W Design 12 Radar Interface S/W Design Receiver Design Optimistic 0 3 6 12 4 5 Receiver Hardware Design Receiver Software Design 6 Design Review 3 Radar Material Acquisition 13 Prototype Manufacturing 12 3 5 8 6 Most Likely 0 5 8 15 5 7 14 5 7 8 4 10 9 Pessimistic Predecessors 0 5 10 20 6 7 16 7 9 10 6 12 12 1 FS 2 SS+5 (lag) 2 FS+5 (lag) 10 FS, 9FS, 4FS, 3 FS 5 FS 5 FS 1 FS 8 FS 8 SS 6 FS, 7FS 11 FS 12 FS
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply