The Chris Beehner Company manufactures two lines of designer yard gates, called model A and model B. Every gate requires

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The Chris Beehner Company manufactures two lines of designer yard gates, called model A and model B. Every gate requires

Post by answerhappygod »

The Chris Beehner Company Manufactures Two Lines Of Designer Yard Gates Called Model A And Model B Every Gate Requires 1
The Chris Beehner Company Manufactures Two Lines Of Designer Yard Gates Called Model A And Model B Every Gate Requires 1 (98.58 KiB) Viewed 33 times
The Chris Beehner Company manufactures two lines of designer yard gates, called model A and model B. Every gate requires blending a certain amount of steel and zinc; the company has available a total of 25,000 lb of steel and 6,000 lb of zinc. Each model A gate requires a mixture of 125 lb of steel and 20 lb of zinc, and each yields a profit of $55. Each model B gate requires 100 lb of steel and 30 lb of zinc and can be sold for a profit of $55. The aim of the objective function for Chris Beehner Company should be to Maximize the objective value. The optimum solution is: Number of Model A gates to be produced Number of Model B gates to be produced: Optimal solution value = (round your response to two decimal places). = (round your response to two decimal places). (round your response to two decimal places).
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply