- Cooper River Glass Woks Crgw Produces Bour Afferent Models Of Deak Lamps As Shown On The Towchart The Operation Manag 1 (17.48 KiB) Viewed 37 times
Cooper River Glass Woks (CRGW) produces bour afferent models of deak lamps as shown on the towchart. The operation manag
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Cooper River Glass Woks (CRGW) produces bour afferent models of deak lamps as shown on the towchart. The operation manag
Cooper River Glass Woks (CRGW) produces bour afferent models of deak lamps as shown on the towchart. The operation manager knows that total money demand exceeds the capacity analalle for production. Thus, the sin deimining the product mix which will maximus profs. Each modes pre routing processing Umes, and material cost s provided in the fowchart Demand next month is einated to be 275 units of model Aphs, 150 ures of mod 125 units of model Charle, end 250 units of model Delta CROW operates only one 8 hours shift per day and is scheduled to work 20 days next month (no overtime). Further each station requires a 10% capecity oustion Co the icon to view the Cooper River Glass Worksh Which station is the b The bottleneck Sition 3, with a total oed of 3000 mutes for the next month your resumber) Using the trional method, which bees na sosely on a products contradant pros and overhead, what is the opna proda mix and what the prot The product mix obed using the rational method a as fotos (your pores as whois numbers if you ana hasamal proces, round your respond to the next mor This pap725 Exposur) Nyu Saw Chate Du Unts to be produced 275 150 305 20