Summary: Layout Strategies What is the cost? Roy Creasey Enterprises, a machine shop, is planning to move to a new, larg

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Summary: Layout Strategies What is the cost? Roy Creasey Enterprises, a machine shop, is planning to move to a new, larg

Post by answerhappygod »

Summary Layout Strategies What Is The Cost Roy Creasey Enterprises A Machine Shop Is Planning To Move To A New Larg 1
Summary Layout Strategies What Is The Cost Roy Creasey Enterprises A Machine Shop Is Planning To Move To A New Larg 1 (47.88 KiB) Viewed 51 times
Summary Layout Strategies What Is The Cost Roy Creasey Enterprises A Machine Shop Is Planning To Move To A New Larg 2
Summary Layout Strategies What Is The Cost Roy Creasey Enterprises A Machine Shop Is Planning To Move To A New Larg 2 (46.18 KiB) Viewed 51 times
Summary Layout Strategies What Is The Cost Roy Creasey Enterprises A Machine Shop Is Planning To Move To A New Larg 3
Summary Layout Strategies What Is The Cost Roy Creasey Enterprises A Machine Shop Is Planning To Move To A New Larg 3 (50.3 KiB) Viewed 51 times
Summary: Layout Strategies What is the cost? Roy Creasey Enterprises, a machine shop, is planning to move to a new, larger location. The new building will be 60 feet long by 40 feet wide. Creasey envisions the building as having six distinct production areas, roughly equal in size. He feels strongly about safety and intends to have marked pathways throughout the building to facilitate the movement of people and materials. See the following building schematic. Building Schematic (with work areas 1-6) 2 Flow Matrix between Production Processes 5 3 6 His foreman has completed a month-long study of the number of loads of material that have moved from one process to another in the current building. This information is contained in the following flow matrix.
3 Pacer-GAI SUNBIZ TO FROM Materials Flow Matrix between Production Processes Welding His foreman has completed a month-long study of the number of loads of material that have moved from one process to another in the current building. This information is contained in the following flow matrix. Drills Lathes Grinders O 25 PBSC MATERIALS WELDING 25 Pearson+ 0 50 Summary: Layout Strategies 100 0 0 25 0 DRILLS LATHES 50 BookSmart 0 0 0 100 0 50 0 0 0 Westlaw Form Build... Distance between Work Areas GRINDERS 0 0 50 20 0 BENDERS 50 0 0 0 0 Finally, Creasey has developed the following matrix to indicate distances between the work areas shown in the building schematic.
-9?locale=&redirectURL=https://plus.pearson.com/home&userPreferredType=read rts Pacer-GA SUNBIZ 1 2 PBSC 3 4 5 6 Finally, Creasey has developed the following matrix to indicate distances between the work areas shown in the building schematic. Pearson+BookSmart W Westlaw Form Build... Summary: Layout Strategies 1 Distance between Work Areas 4 2 20 3 40 20 20 40 60 What is the appropriate layout of the new building? P 5 40 20 40 20 6 60 40 20 40 20
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply