Answer the blank boxes below: Favorable or unfavorable for boxes 1, 2 and 4 and 3 is higher or lower quality? Favorable

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Answer the blank boxes below: Favorable or unfavorable for boxes 1, 2 and 4 and 3 is higher or lower quality? Favorable

Post by answerhappygod »

Answer the blank boxes below: Favorable orunfavorable for boxes 1, 2 and 4 and 3 is higher or lowerquality?
Answer The Blank Boxes Below Favorable Or Unfavorable For Boxes 1 2 And 4 And 3 Is Higher Or Lower Quality Favorable 1
Answer The Blank Boxes Below Favorable Or Unfavorable For Boxes 1 2 And 4 And 3 Is Higher Or Lower Quality Favorable 1 (201.53 KiB) Viewed 30 times
Favorable or unfavorable for boxes 1, 2 and 4 and 3is higher or lower quality?
Quality Fender, which uses a standard cost system, manufactured 20,000 boat fenders during 2018, using 141,000 square feet of extruded vinyl purchased at $1.25 per square foot. Production required 450 direct labor hours that cost $13.50 per hour. The direct materials standard was seven square feet of vinyl per fender, at a standard cost of $1.30 per square foot. The labor standard was 0.027 direct labor hour per fender, at a standard cost of $12.50 per hour. Read the requirement. Begin with the cost variances. Select the required formulas, compute the cost variances for direct materials and direct labor, and identify whether each variance is favorable (F) or unfavorable (U). (Abbreviations used: AC = actual cost; AQ = actual quantity; FOH = fixed overhead; SC = standard cost; SQ = standard quantity.) Direct materials cost variance Direct labor cost variance Variance $ 7,050 F = $ 450 U Select the required formulas, compute the efficiency variances for direct materials and direct labor, and identify whether each variance is favorable (F) or unfavorable (U). (Abbreviations used: AC = actual cost; AQ = actual quantity; FOH = fixed overhead; SC = standard cost; SQ = standard quantity.) = The direct materials variance is = Formula (AC-SC) × AQ (AC-SC) × AQ = Formula (AQ - SQ) × SC (AQ - SQ) × SC direct materials cost variance combined with the = Direct materials efficiency variance Direct labor efficiency variance Does the pattern of variances suggest Quality Fender's managers have been making trade-offs? Explain. = Variance = 1,300 U 1,125 F direct materials efficiency variance suggests that managers may have used direct materials. The net effect on the total
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply