Question 4 A production centre has three production departments, A, B and C. Budgeted production overhead costs for the

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Question 4 A production centre has three production departments, A, B and C. Budgeted production overhead costs for the

Post by answerhappygod »

Question 4 A Production Centre Has Three Production Departments A B And C Budgeted Production Overhead Costs For The 1
Question 4 A Production Centre Has Three Production Departments A B And C Budgeted Production Overhead Costs For The 1 (35.42 KiB) Viewed 56 times
Question 4 A Production Centre Has Three Production Departments A B And C Budgeted Production Overhead Costs For The 2
Question 4 A Production Centre Has Three Production Departments A B And C Budgeted Production Overhead Costs For The 2 (38.93 KiB) Viewed 56 times
Question 4 A production centre has three production departments, A, B and C. Budgeted production overhead costs for the next period are as follows: R 60,000 80,000 20,000 18,000 Factory rent Equipment depreciation Insurance Heating and lighting Indirect materials: Department A Department B Department C Indirect labour: Department A Department B Department C 7,000 6,600 9,400 40,000 27,000 20,000 (10 Marks) Insurance costs relate mainly to health and safety insurance, and will beapportioned on the basis of the number of employees in each department. Heating and lighting costs will be apportioned on the basis of volume.

Other relevant information is as follows: Direct labour hours Number of employees Floor area (square metres) Cost of equipment (R000s) Volume (cubic metres) Total 18,000 50 1,200 1,000 18,000 Department Department A 8,000 20 300 200 8,000 B 6,000 16 400 600 6,000 Department C 4,000 14 500 200 4,000 Required: a) Calculate the overhead costs for each production department. b) Calculate an overhead absorption rate for the period for each department, assuming that a separate direct labour hour absorption rate is used for each department. c) Calculate an overhead absorption rate for the period, assuming that a single factory-wide direct labour hour absorption rate is used.