Page 1 of 1

Q. 12 A well is drilled through gas reservoir of following composition 500 m below the subsurface. The bottom hole press

Posted: Fri Jul 01, 2022 7:23 am
by answerhappygod
Q 12 A Well Is Drilled Through Gas Reservoir Of Following Composition 500 M Below The Subsurface The Bottom Hole Press 1
Q 12 A Well Is Drilled Through Gas Reservoir Of Following Composition 500 M Below The Subsurface The Bottom Hole Press 1 (184.92 KiB) Viewed 26 times
Q. 12 A well is drilled through gas reservoir of following composition 500 m below the subsurface. The bottom hole pressure is 20 bars and temperature 800 K. The surface conditions are Pressure = 1 bar and temperature = 300 K. Estimate the actual work required in KW to transport the gas through the well to the surface given that it flows adiabatically. The radius of wellbore is 20-ft. The velocity at bottom of well is 200 m/s. The reservoir temperature is 800K. (Hint: To solve this question first justify the ideal condition exist in the well)
Component C1 C2 C3 Composition, mole fraction 0.46 0.38 0.16