- Activity Rough Grading Plan Building Permit Issued Sitework Rough Grade Install Temporary Power Sitework Finish Gr 1 (93.77 KiB) Viewed 23 times
Activity Rough Grading Plan - Building Permit Issued Sitework - Rough Grade Install Temporary Power Sitework - Finish Gr
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Activity Rough Grading Plan - Building Permit Issued Sitework - Rough Grade Install Temporary Power Sitework - Finish Gr
Activity Rough Grading Plan - Building Permit Issued Sitework - Rough Grade Install Temporary Power Sitework - Finish Grade Excavate Form Continuous Footings & Pads Pour Concrete (Type III) Backfill to create Finish Grade Blocked Wall (Masonry) Frame Stud Walls Install Roofing Rough HVAC Rough Plumbing Brick Veneer (Masonry) Rough Electrical Wall Insulation Exterior Trim Drywall-Tape and Finish Paint Exterior Insulate Ceiling Interior Crown-Molding Landscape Paint Interior Install Wall Fixtures Electrical Finish Install Cabinets Ceramic Tiled Wainscoting Cabinet Countertops Floor Coverings Install Appliances Plumbing Finish HVAC Finish Clean-Up Final Inspection (Pre-Certificate of Occupancy issuance) Duration (days) 10 5 2 5 4 5 3 2 12 9 2 2 2 5 2 1 1 4 5 1 2 4 4 1 2 3 2 2 2 1 1 1 2 2 Activity ID 1030 1035 1040 1045 1050 1060 1070 1080 1085 1090 1100 1110 1120 1130 1140 1150 1160 1170 1180 1190 1200 1210 1220 1230 1240 1250 1260 1270 1280 1290 1300 1310 1320 1330 IPA (LAG) 1030 1035 1035 (5) 1040 1050 1060 1070 (10) 1080 (2) 1080 (2) 1090 1100 1100 1100 1120,1110,1130 1100 1150 1200 1140 1160 1150 1190 1140 (6),1180 (4) 1170 1250 1210 (1) 1220 1270 1250 1250 1280 1210 (2) 1210 (1) 1240,1300, 1310 1230,1270,1260 1210,1290, 1250 1320 Relationship FS FS FF SS FS FS FS FS SS SS FS FS FS SS FF FS SS FF FS FS SS FS FS FS SS SS FS FF SS SS FS SS SS FS FS FF FS