(c) (d) Assume that a system can fail due to preventive maintenance-related human error and non-human error. The values

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

(c) (d) Assume that a system can fail due to preventive maintenance-related human error and non-human error. The values

Post by answerhappygod »

C D Assume That A System Can Fail Due To Preventive Maintenance Related Human Error And Non Human Error The Values 1
C D Assume That A System Can Fail Due To Preventive Maintenance Related Human Error And Non Human Error The Values 1 (60.57 KiB) Viewed 28 times
(c) (d) Assume that a system can fail due to preventive maintenance-related human error and non-human error. The values of human and non-human error rates are 0.0002 errors per hour and 0.005 failures per hour, respectively. Calculate the probability of the system failure due to maintenance error for a 100-h mission. Assume that for a system the following data are specified: As = 0.004 failures per hour, Ame=0.0001 errors per hour, Ad = 0.001 failures per hour, μs = 0.02 repairs per hour, μme=0.008 repairs per hour, Hd = 0.06 repairs per hour. [3 marks] Calculate the steady-state probability of system degradation due to maintenance error. [5 marks]
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply