Using the Per Unit method and symmetrical components calculate expected fault current with the load bus shorted for a Li
Posted: Fri Jul 01, 2022 6:01 am
Using the Per Unit method and symmetrical components calculateexpected fault current with the load bus shorted fora Line to Ground fault. All generators areoperating at rated voltage. Assume all transformers aredelta on the primary and grounded Y on thesecondary.
SBASE = 100MVA