Question 4. Scheduling (25 marks) a) Seven Jobs must be processed in two operations: X and Y. All seven jobs must go thr

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Question 4. Scheduling (25 marks) a) Seven Jobs must be processed in two operations: X and Y. All seven jobs must go thr

Post by answerhappygod »

Question 4 Scheduling 25 Marks A Seven Jobs Must Be Processed In Two Operations X And Y All Seven Jobs Must Go Thr 1
Question 4 Scheduling 25 Marks A Seven Jobs Must Be Processed In Two Operations X And Y All Seven Jobs Must Go Thr 1 (38.4 KiB) Viewed 24 times
Question 4. Scheduling (25 marks) a) Seven Jobs must be processed in two operations: X and Y. All seven jobs must go through X first and then Y in sequence. Determine the optimal order in which the jobs should be sequenced so that the total time to finish all jobs is minimized. Draw the Gantt chart and determine the total time to finish all the jobs and the idle time at Process Y in the schedule. (8 marks) H Jobe A B Ce De E Fe Process X Time (hours)< 9 84 10 6 14 24 44 Process Y Time (hours)< 5 74 34 24 6 74 b) Assuming there is an 8th job (Job H) arrives while the 1st Job assigned has just finished its operation at Process X, the 8th job has the Process X Time of 2 hours and Process Y Time of 2 hours too, how would you assign this 8th job to the current sequence in order to minimize the total time to finish all jobs (makespan)? Why? (8 marks)< ← c) Assuming situation in part (b) is not considered. If the operating time on Process Y for Job A was revised to 5 hours, should we change the processing sequence in order to minimize the total length of the schedule? Why? What about if we prefer a shorter mean flow time in the meanwhile? Why? (9 marks)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply