REINFORCING BARS SPECIFICATIONS:COLUMNS: 8- D12mm RSBStirrups: D10mm spaced at 0.20m OCFOOTINGS: 6-D12mm RSB OCBW WALL FOOTING: 3-D12mmTies: D10mm spaced as 0.20m OCMASONRY SPECIFICATIONS:Use 5” CHBReinforcement: Every 2 layers, 0.60m OCINSTRUCTIONS:1. Convert all computation to PESOS.2. Categorize each activity/scope of work but summarize your final labor cost.3. Follow format as discussed in orientation.
REINFORCING BARS SPECIFICATIONS:
COLUMNS: 8- D12mm RSB
Stirrups: D10mm spaced at 0.20m OC
FOOTINGS: 6-D12mm RSB OCBW
WALL FOOTING: 3-D12mm
Ties: D10mm spaced as 0.20m OC
MASONRY SPECIFICATIONS:
Use 5” CHB
Reinforcement: Every 2 layers, 0.60m OC
INSTRUCTIONS:
1. Convert all computation to PESOS.
2. Categorize each activity/scope of work but summarize your final labor cost.
3. Follow format as discussed in orientation.
Scenario Province Xoxdhawarded You The Project Of Fencing The Length Of The Going To The Airport The Length Is 2200m An 4 (14.63 KiB) Viewed 68 times
Scenario Province Xoxdhawarded You The Project Of Fencing The Length Of The Going To The Airport The Length Is 2200m An 5 (14.63 KiB) Viewed 68 times
Scenario Province Xoxdhawarded You The Project Of Fencing The Length Of The Going To The Airport The Length Is 2200m An 6 (9.65 KiB) Viewed 68 times
Scenario Province Xoxdhawarded You The Project Of Fencing The Length Of The Going To The Airport The Length Is 2200m An 7 (11.34 KiB) Viewed 68 times
Scenario: Province XOXDhawarded you the project of fencing the length of the going to the airport The length is 2200m and fence will be constructed on both sides of the highway. These are to be plastered on both faces. You are to compute the labor cost of the project with the following sections 2.0 OC 250m 0.5m 0250 250.00 0.400.00 REINFORCING BARS SPECIFICATIONS Columns 5-012 Stirpe Died 0.20 OC Footing SOCOW Wall footing 2012 Time: Deus 6.20 oC MASONRY SPECIFICATIONS: Use CHS Reinforcement Every 2 layen...comoc INSTRUCTIONS 1. Convert al compito PESOS 2 Categorie cach activity scope of work but sure your bro Footweineretion
4.00m OC 2.50m 0.35m 0.50m HO 0.25x0.25m col 0.30 wall ftg 0.40x0.40m ftg
4.00m OC 2.50m 0.35m 0.50m
0.25x0.25m col 0.30 wall ftg 0.40x0.40m ftg