Explain:
The operation of a hydro-electric power system and state the
principal factor that indicates the amount of available energy in a
Hydro-electric power system. (max 100 words)
The economic principle of the government’s Feed-in
Tariff (FIT) for a sustainable generation electricity
system. (max 100 words)
Explain: The operation of a hydro-electric power system and state the principal factor that indicates the amount of ava
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am