When estimated activity used for overhead application is less than the level of activity at capacity, the use of capacit

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

When estimated activity used for overhead application is less than the level of activity at capacity, the use of capacit

Post by answerhappygod »

When Estimated Activity Used For Overhead Application Is Less Than The Level Of Activity At Capacity The Use Of Capacit 1
When Estimated Activity Used For Overhead Application Is Less Than The Level Of Activity At Capacity The Use Of Capacit 1 (29.8 KiB) Viewed 39 times
When estimated activity used for overhead application is less than the level of activity at capacity, the use of capacity based overhead rate decreases net operating income due to the cost of idle capacity Job cost sheets contain entries for actual direct material, actual direct labot, and actual manufacturing overhead cost incurred in completing a job Using a plantwide overhead rate based on direct labor-hours will ensure that direct labor costs are correctly traced to jobs a Using multiple predetermined overhead rates rather than a single predetermined plant wide overhead rate improves the job cost accuracy If a job is not completed at the end of the period, then no manufacturing overhead cost would be applied to that job when a predetermined overhead rate is used.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply