REVIEW b. Use a template jig, capable of producing 50 parts per hour and costing $75.00, in the pro- duction department,

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

REVIEW b. Use a template jig, capable of producing 50 parts per hour and costing $75.00, in the pro- duction department,

Post by answerhappygod »

Review B Use A Template Jig Capable Of Producing 50 Parts Per Hour And Costing 75 00 In The Pro Duction Department 1
Review B Use A Template Jig Capable Of Producing 50 Parts Per Hour And Costing 75 00 In The Pro Duction Department 1 (130.49 KiB) Viewed 44 times
REVIEW b. Use a template jig, capable of producing 50 parts per hour and costing $75.00, in the pro- duction department, where an operator earns $14.00per hour. c. Use a duplex jig, which costs $120.00and can produce a part every 26 seconds, in the produc- tion department, where an operator earns $14.00 per hour. 2. Using the listed alternatives, prepare a compara- tive analysis for the following tooling problem: A total of 950 flange plates require four holes accu- rately drilled 90 degrees apart to mate with a con- nector valve. Which of the listed alternatives is the most economically desirable? a. Have a machinist who earns $20.00 per hour lay out and drill each part at a rate of 2 minutes per part 3. Assuming everything to be the same as in prob- lem 2, which alternative is the most economical for 135 parts?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply