Camyo Manufacturing produces four parts that require the use of
a lathe and a drill press. The two machines operate 10 hours a day.
The following table provides the time in minutes required by each
part:
It is desired to balance the two machines by limiting the
difference between their total
operation times to at most 30 minutes. The market demand for each
part is at least
10 units. Additionally, the number of units of part 1 may not
exceed that of part 2.
Suppose that the market demand goal is twice as important as
that of
balancing the two machines, and that no overtime is allowed. Solve
the problem, and
determine if the goals are met.
Production time in min Part Lathe Drill press 1 2 3 4 5 6 4 7 AN 3 2 6 4
Camyo Manufacturing produces four parts that require the use of a lathe and a drill press. The two machines operate 10 h
-