Question 7 Not yet answered Points out of 5.00 P Flag question If a process is in control, the probability for a 3-sigma
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Question 7 Not yet answered Points out of 5.00 P Flag question If a process is in control, the probability for a 3-sigma
Question 7 Not yet answered Points out of 5.00 P Flag question If a process is in control, the probability for a 3-sigma control chart to detect out of control on the 101th sample is Select one: a 0.0031 ob. 0.0016 Oc 0.0021 Od 0.0026 O 0.0036