company has 20 solar tabber and stinger machines. The solar tabber and stringer machines are equipment that allows to solder and assemble the cells together in order to compose the photovoltaic cell at the rate of 50pcs per hour. The man-machine ratio is 1:1. At present, the company has 6 technicians per shift and they are working 3 shifts in a day with 75- minute break. They have 5 working days per week and 4 weeks in a month. However, 2 Technicians of Shift 2 were tested positive for Corona Virus (COVID -19) on Day 2 of Week 3, how many panels will be the lost capacity? a 2700 b. 2800 C. 3000
Forwarded Sun Power is producing a solar panel composed of 100 solar cells. The company has 20 solar tabber and stinger machines. The solar tabber and stringer machines are equipment that allows to solder and assemble the cells together in order to compose the photovoltaic cell at the rate of 50pcs per hour. The man-machine ratio is 1:1. At present, the company has 6 technicians per shift and they are working 3 shifts in a day with 75-a minute break. They have 5 working days per week and 4 weeks in a month. How many panels can they produce in one month? a. 121,500 b. 120,000 C 125,000 d. none of the above 3:28 am
Sun Power is producing a solar panel composed of 100 solar cells. The Sun Power is producing a solar panel composed of 100 solar cells. The company has 20 solar tabber and stinger machines.
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am