Newhard Company assigns overhead cost to jobs on the basis of
113% of direct labor cost. The job cost sheet for Job 313 includes
$29,796 in direct materials cost and $10,800 in direct labor
cost. A total of 1,600 units were produced in Job 313.
Required:
a. What is the total manufacturing cost
assigned to Job 313?
b. What is the unit product cost for Job 313?
Newhard Company assigns overhead cost to jobs on the basis of 113% of direct labor cost. The job cost sheet for Job 313
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am