UM 4680 Business Analytics Spring online (1) nicole polo pacheco 02/11/22 10:01 AM Homework: Chapter 11 Question 9. 11.5

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

UM 4680 Business Analytics Spring online (1) nicole polo pacheco 02/11/22 10:01 AM Homework: Chapter 11 Question 9. 11.5

Post by answerhappygod »

Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 1
Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 1 (21.84 KiB) Viewed 61 times
Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 2
Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 2 (69.46 KiB) Viewed 61 times
Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 3
Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 3 (72.19 KiB) Viewed 61 times
Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 4
Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 4 (78.69 KiB) Viewed 61 times
Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 5
Um 4680 Business Analytics Spring Online 1 Nicole Polo Pacheco 02 11 22 10 01 Am Homework Chapter 11 Question 9 11 5 5 (78.69 KiB) Viewed 61 times
UM 4680 Business Analytics Spring online (1) nicole polo pacheco 02/11/22 10:01 AM Homework: Chapter 11 Question 9. 11.5.37 HW Score: 90%, 90 of 100 points Save Points: 0 of 10 A theater need to do in the low-cost production but for an upcoming show. Specificallyto which set piecast which anyte pieces to rent from arbete predd fewer has to construct the store the play storical and pricing formation de son po The theater wars to termine how many of each should be built by the hand how many should be rented to Develop a comprents tuit and runtod as well as the total hours red carpenters and persExpert wie by the puble boston Womto fed the best at the bo way and the required to units of each type Cickition to women and conformation Click here some positie beson The best solution requires building flatis, in nanong drops), and propia) at a cost of Type tager or decimals Do not round and eeting fish tanong drops), and propelata contes The total cost will be
< Question 9, 11.5.37 > HW Score: Points: Х Material requirements and pricing information The theater has two part-time carpenters who work up to 10 hours a week, each at $12 an hour, and a part-time scenic artist who can work 17 hours per week to paint the set and props as needed at a rate of $17 per hour. The set design requires 24 flats (walls), 2 hanging drops with painted scenery, and 3 large wooden tables (props). The number of hours required for each piece for carpentry and painting is shown in the accompanying table. Flats, hanging drops, and props can also be rented at a cost of $80.00, $500.00, and $375.00, respectively. Carpentry Painting Flats 2.0 Hanging Drops 2.0 11.0 Props 2.0 0.5 3.0 Print Done Get more help е да 23
< Question 9, 11.5.37 > HW Score: 90%, « Points: 0 of 10 udget for an upcoming show. Specifically, they have to determine which set pieces to construct and which, if any, s b weeks to fully construct the set before the play goes into technical rehearsals. Material requirements and pricing buld be built by the theater and how many should be rented to minimize total costs. Develop a spreadsheet model Kemp Х Possible best solutions tions Some possible best solutions to try are listed below. • The solution in which all of the flats, hanging drops, and props are built in-house • The solution in which the theater builds 3 flats, 2 hanging drops, and 2 props • The solution in which the theater builds 1 flat, 2 hanging drops, and 3 props • The solution in which the theater builds 4 flats, 2 hanging drops, and 1 prop op(s) Print Done ble Get more help С
A theater needs to determine the lowest-cost production budget for an upcoming show. Specifically, they have to determine which set pieces to construct and which, if any, set pieces to rent from another local theater at a predetermined fee. However, the organization has only two weeks to fully construct the set before the play goes into technical rehearsals. Material requirements and pricing information for three types of units are provided. The theater wants to determine how many of each unit should be built by the theater and how many should be rented to minimize total costs. Develop a spreadsheet model that computes the total cost for any mix of units built and rented, as well as the total hours required for carpenters and painters. Experiment with the model by testing each of the possible best solutions, included, to attempt to find the best solution that meets the labor availability and the required number of units of each type.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply