A parts feeder has a low-level sensor at the 10th part and high-level sensor at the 50th part. The cycle time (TC) is 6

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A parts feeder has a low-level sensor at the 10th part and high-level sensor at the 50th part. The cycle time (TC) is 6

Post by answerhappygod »

A Parts Feeder Has A Low Level Sensor At The 10th Part And High Level Sensor At The 50th Part The Cycle Time Tc Is 6 1
A Parts Feeder Has A Low Level Sensor At The 10th Part And High Level Sensor At The 50th Part The Cycle Time Tc Is 6 1 (15.42 KiB) Viewed 46 times
A parts feeder has a low-level sensor at the 10th part and high-level sensor at the 50th part. The cycle time (TC) is 6 seconds, the part selector probability (6) is 0.1, and the feed rate (f) is 56 parts/minute. Determine the depletion time (Tde) to the nearest 0.1 minute.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply