a) Table Q5a. gives information on the daily employee resource required for a 9-task project together with the early sta

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

a) Table Q5a. gives information on the daily employee resource required for a 9-task project together with the early sta

Post by answerhappygod »

A Table Q5a Gives Information On The Daily Employee Resource Required For A 9 Task Project Together With The Early Sta 1
A Table Q5a Gives Information On The Daily Employee Resource Required For A 9 Task Project Together With The Early Sta 1 (30.26 KiB) Viewed 50 times
A Table Q5a Gives Information On The Daily Employee Resource Required For A 9 Task Project Together With The Early Sta 2
A Table Q5a Gives Information On The Daily Employee Resource Required For A 9 Task Project Together With The Early Sta 2 (29.3 KiB) Viewed 50 times
A Table Q5a Gives Information On The Daily Employee Resource Required For A 9 Task Project Together With The Early Sta 3
A Table Q5a Gives Information On The Daily Employee Resource Required For A 9 Task Project Together With The Early Sta 3 (29.3 KiB) Viewed 50 times
a) Table Q5a. gives information on the daily employee resource required for a 9-task project together with the early start dates, durations and associated float for each task. Activity Float (days) Early Sun Day) Duration (Days А B с D E F G 0 0 0 0 1 0 1 3 2 2 2 1 2 2 Employees Required (Per Day! 3 4 2 1 2 3 7 8 10 Table Q5a. On the basis of the information presented in Table Q5a. draw up a Gantt Chart showing activities and their relative timing. Indicate on the chart the available float. Also show the resources required for each day per activity as shown in the example for activity A in Figure Q5a (i). (4 marks) Day Activity 6 3 3 A B c D E F G H 1 Tal Row Figure Q5a(i).

Table Q5a. gives information on the daily employee resource required for a 9-task project together with the early start dates, durations and associated float for each A 3 C D E o 1 0 1 0 Table 05a. On the basis of the information presented in Table QSa draw up a Gantt Chart showing activities and their relative timing. Indicate on the chart the available float. Also show the resources required for cach day per activity as shown in the example for activity A in Figure 05a (1). (4 marks) They AG G 1 Figure Osali). 0o Draw a network diagram using the information on activity, day and duration, then perform a forward and backward pass to complete all of the activity boxes (12 marks) Draw up Resource Histograms for (a) Early Starts and (b) Late Starts, showing the resource loadings, and signifying resource availability limit of 8 employees per day. (8 marks) w Comment on the results in terms of employee resource requirement vs availability over the duration of the project given that you are limited to a maximum of 8 employees per day (1 mark)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply