QUESTION 1 A call center company would like to study the enquiries transactional time using simulation to identify a var
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
QUESTION 1 A call center company would like to study the enquiries transactional time using simulation to identify a var
QUESTION 1 A call center company would like to study the enquiries transactional time using simulation to identify a variety of operating characteristics. As part of the study, data was collected on calls processing time as given in the following table. Processing time (minutes) x Pr.(x) 10 1 0.08 4 0.16 0.42 If the generated random number r = 0.49, calculate the simulated processing time (in minutes) that would be used to simulate the processing time