OPERATION 1 Clay Mixing INSPECTION OPERATION 2 Casting 4M OPERATION 8 Packaging 2M Store OPERATION 9 15M -10M- TOTAL :39
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
OPERATION 1 Clay Mixing INSPECTION OPERATION 2 Casting 4M OPERATION 8 Packaging 2M Store OPERATION 9 15M -10M- TOTAL :39
Figure 2
Explain in details about the layout improvement from
figure 1 to figure 2 and their benefits .
*specify the duration and distance
OPERATION 1 Clay Mixing INSPECTION OPERATION 2 Casting 4M OPERATION 8 Packaging 2M Store OPERATION 9 15M -10M- TOTAL :39MIN 5M OPERATION 3 Base cutting OPERATION 4 Semi-Finishing OPERATION 6 Dipping -6M- OPERATION 7 Firing 6M OPERATION 5 Blasting
OPERATION 1 Clay Mixing OPERATION 2 Casting -2M- OPERATION3 Base cutting 3M 3M 3M OPERATION 6 DIPPING OPERATION 5 Blasting OPERATION 4 Semi-Finishing -4M- Packaging OPERATION 8 OPERATION 7 Firing 2M INSPECTION 2M 3M Store OPERATION 9