OPERATION 1 Clay Mixing INSPECTION OPERATION 2 Casting 4M OPERATION 8 Packaging 2M Store OPERATION 9 15M -10M- TOTAL :39

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

OPERATION 1 Clay Mixing INSPECTION OPERATION 2 Casting 4M OPERATION 8 Packaging 2M Store OPERATION 9 15M -10M- TOTAL :39

Post by answerhappygod »

Operation 1 Clay Mixing Inspection Operation 2 Casting 4m Operation 8 Packaging 2m Store Operation 9 15m 10m Total 39 1
Operation 1 Clay Mixing Inspection Operation 2 Casting 4m Operation 8 Packaging 2m Store Operation 9 15m 10m Total 39 1 (33.24 KiB) Viewed 321 times
Figure 1
Operation 1 Clay Mixing Inspection Operation 2 Casting 4m Operation 8 Packaging 2m Store Operation 9 15m 10m Total 39 2
Operation 1 Clay Mixing Inspection Operation 2 Casting 4m Operation 8 Packaging 2m Store Operation 9 15m 10m Total 39 2 (35.6 KiB) Viewed 321 times
Figure 2
Explain in details about the layout improvement from
figure 1 to figure 2 and their benefits .

*specify the duration and distance
OPERATION 1 Clay Mixing INSPECTION OPERATION 2 Casting 4M OPERATION 8 Packaging 2M Store OPERATION 9 15M -10M- TOTAL :39MIN 5M OPERATION 3 Base cutting OPERATION 4 Semi-Finishing OPERATION 6 Dipping -6M- OPERATION 7 Firing 6M OPERATION 5 Blasting
OPERATION 1 Clay Mixing OPERATION 2 Casting -2M- OPERATION3 Base cutting 3M 3M 3M OPERATION 6 DIPPING OPERATION 5 Blasting OPERATION 4 Semi-Finishing -4M- Packaging OPERATION 8 OPERATION 7 Firing 2M INSPECTION 2M 3M Store OPERATION 9
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply