4. We are looking to run three computations (or jobs) on the IRIDIS 5 supercomputer at the University of Southampton: j1

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

4. We are looking to run three computations (or jobs) on the IRIDIS 5 supercomputer at the University of Southampton: j1

Post by answerhappygod »

4 We Are Looking To Run Three Computations Or Jobs On The Iridis 5 Supercomputer At The University Of Southampton J1 1
4 We Are Looking To Run Three Computations Or Jobs On The Iridis 5 Supercomputer At The University Of Southampton J1 1 (18.52 KiB) Viewed 443 times
4 We Are Looking To Run Three Computations Or Jobs On The Iridis 5 Supercomputer At The University Of Southampton J1 2
4 We Are Looking To Run Three Computations Or Jobs On The Iridis 5 Supercomputer At The University Of Southampton J1 2 (27.75 KiB) Viewed 443 times
please solve in 35 mins i will give you upvote
4. We are looking to run three computations (or jobs) on the IRIDIS 5 supercomputer at the University of Southampton: j1 j2. j3. A total of 5 compute nodes are available: n1, n2, n3, na, n5. Jobs j₁ and j2 carry out some complex matrix computations and can only be run on compute nodes ₁ and 2 (which are the only ones equipped with a GPU). Job j3 can run on any compute node. The jobs can be seamlessly moved
from a compute node to another one as many times as necessary (for instance, a job could run for 20% of the time on n₁, for 40% of the time on 1₂, and for 40% of the time on 13). Since IRIDIS 5 is oversubscribed, each compute node can be used for no more than 7 days in total and a single job can be scheduled to run on a node for, in total, no more than 2 days. For their completion, j1 j2, and j3 need, respectively, 4, 5, and 6 days of computations. Model the problem of scheduling the three jobs on the IRIDIS 5 supercomputer as a maximum-flow problem and report the corresponding graph (with source, sink, and arc capacities). [20 marks]
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply