Name : man kasebut liazor prin asetrievbezib box anslagva 10. The work done to raise an elephant 12 m is 8.5 x 105 Joule
Name : man kasebut liazor prin asetrievbezib box anslagva 10. The work done to raise an elephant 12 m is 8.5 x 105 Joules. a) If the mass of the elephant is 5000 kg, calculate the energy output of the system. (3 marks) Force Soookg Distance m Time b) Calculate the efficiency of the system used to raise the elephant. (3 marks)