The economics information: Bottom • Assume plant avaiabilty of 90% per yearaddahe project will last for 20 years. Exchan

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The economics information: Bottom • Assume plant avaiabilty of 90% per yearaddahe project will last for 20 years. Exchan

Post by answerhappygod »

The Economics Information Bottom Assume Plant Avaiabilty Of 90 Per Yearaddahe Project Will Last For 20 Years Exchan 1
The Economics Information Bottom Assume Plant Avaiabilty Of 90 Per Yearaddahe Project Will Last For 20 Years Exchan 1 (73.65 KiB) Viewed 32 times
The economics information: Bottom • Assume plant avaiabilty of 90% per yearaddahe project will last for 20 years. Exchange rate $1=R14 ●Feed to the Distillation Section cost of production: R1.5/lb Light key distillate: R350/lb Labor Costs (plant requires 1 Production Manager, 1 Process Engineer, 1 Process Technologist, 1 Production Foreman, Process Controllers, 1 Mechanical Foreman, 1 Electrical Foreman, 2 Learner Mechanical Artisans, 2 Learner Electrical Artisans, 2 Administration Clerks and 3 Cleaners) Salaries paid to your employees per year: Production Manager/Process Engineer: R2000000 o Production Foreman/Process Technologist/Mechanical Foreman/Electrical Foreman: R1000000 Process Controller/Administration Clerks/Cleaner: R700000 Equipment Costing Chapter 6: Consult literature for the cost of recovery distillation column, pipes, valve, pump, and heat exchanger Installation cost -30% of the total equipment costs • Cooling water: R10 per m³ Electricity: R200/MWh (Eskom peak times) o R100/MWh (Eskom off-peat times) High pressure saturated steam: R25 per tonne Tax rate = 28% Weighted average cost of capital (WACC) = 14% Assume linear (straight-line) depreciation over 60 months, with zero salvage value allocated Estimate equipment cost of the two distillation columns, and heat exchanger? Perform the following process economics (COST ESTIMATION): Net present value, payback time, return on investment, and future value of this project?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply