QUESTION 12 5 points Save Answer Two alternative structures are considered for a section of road. Plan A uses asphalt pa

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

QUESTION 12 5 points Save Answer Two alternative structures are considered for a section of road. Plan A uses asphalt pa

Post by answerhappygod »

Question 12 5 Points Save Answer Two Alternative Structures Are Considered For A Section Of Road Plan A Uses Asphalt Pa 1
Question 12 5 Points Save Answer Two Alternative Structures Are Considered For A Section Of Road Plan A Uses Asphalt Pa 1 (49.48 KiB) Viewed 31 times
QUESTION 12 5 points Save Answer Two alternative structures are considered for a section of road. Plan A uses asphalt pavement; Plan B uses concrete pavement. The first cost of asphalt pavement is $185,000 with an annual maintenance cost of $1,900, and life span of 40 years. The concrete pavement cost is $230,000 with a life of 40 years. Annual maintenance cost of concrete pavement is $1,300. Considering discount rate of 5% per annum and study period of 40 years, which plan do you recommend? (5 marks) For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac). BIUS Paragraph Open Sans,sa... V V 10pt A V Ix XQ SA ==== E |||
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply