Question 10 (2 points) Saved An experienced surveyor takes a horizontal distance measurements with a total station conta
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
Question 10 (2 points) Saved An experienced surveyor takes a horizontal distance measurements with a total station conta
Question 10 (2 points) Saved An experienced surveyor takes a horizontal distance measurements with a total station containing a high precision EDM (1mm +/- 1.5ppm) between two known locations in Hobart. The surveyor calculates that the coordinates provided in the MGA2020 map projection are exactly 100 m however, the measurement reads 99.962 m. A likely reason for the difference between these distances is;