- During An Oedometer Test A 10 Mm Thick Soil Sample Completed 50 Of Consolidation For 1 Minute Calculate The Time For 1 (36.29 KiB) Viewed 45 times
During an Oedometer test, a 10 mm thick soil sample completed 50% of consolidation for 1 minute. Calculate the time for
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
During an Oedometer test, a 10 mm thick soil sample completed 50% of consolidation for 1 minute. Calculate the time for
During an Oedometer test, a 10 mm thick soil sample completed 50% of consolidation for 1 minute. Calculate the time for 50% consolidation for a 10 m thick layer (drainage is allowed only at the top) of the same clay: O 7 months O 38.3 years O 7.6 years O 1.2 year