C. Answer each of these questions about the Lake House. 1. How many cubic yards of concrete are required for the concret

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

C. Answer each of these questions about the Lake House. 1. How many cubic yards of concrete are required for the concret

Post by answerhappygod »

C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 1
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 1 (39.73 KiB) Viewed 37 times
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 2
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 2 (55.91 KiB) Viewed 37 times
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 3
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 3 (25.17 KiB) Viewed 37 times
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 4
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 4 (27.66 KiB) Viewed 37 times
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 5
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 5 (58.11 KiB) Viewed 37 times
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 6
C Answer Each Of These Questions About The Lake House 1 How Many Cubic Yards Of Concrete Are Required For The Concret 6 (57.64 KiB) Viewed 37 times
C. Answer each of these questions about the Lake House. 1. How many cubic yards of concrete are required for the concrete slab at elevation 337.00 feet? 2. What is the length of the concrete piers between the kitchen and the garage? 3. How many lineal feet of 1x pine trim are needed to cover the bottom of the LVL beam over the kitchen? 4. How long are the rafters in the corrugated roof? (Refer to the illustrated rafter table.) 5. How long is the hip rafter at the northeast corner of the roof? (Refer to the illustrated rafter table.) 250 Part 2 Test 19 17 6 15 20 4 3 2 23 LENGTH 12 16 PER FOOT 1389 18 30 OFF CENTERS 16 INCHES #FEET JACKS VALLEY 18 1/2 27 3/4 10 3/8 111/16 1342 10 17 7/8 26 13/16 10 3/4 115/16 1265 1744 15 7/8 255/16 1130 13 1700 176/16 26 11 1/16 11 1/2 11 00 16 1/4 245/10 11 13/10 11 15/16 USE SIDE 11 11/16 119 212, 2/2 COMMON HOP OR IN LENGTH CUT 211. 21 RAFTERS VALLEY OF JACK OF HIP OR 210 118 13 12 37 1723 10 1/2 24 34 115/0 11 13/16

MAGNETIC NORTH TRUE&CALLED NORTH FRON N/F TOMAG 548 3 N/F TONAC MS 60 N Tes 7630 (TO HIMM) 544 541 540 m1 316 TA 754 IP SET TO IMM STONE WAR N860-SE 000 SPARTAE TLE PELPAS NTROVED BY CITY HEALTH DEPT AVOK STATE DEPT ON Conesian GRAVEL DRO Yo they (ohnny Med 40-0 DUM LAKE 140 SITE PLAN Peler 315 T-MA 200-00 -MNOPAL WATER VALE poo A GONG TEC TO HAM) NET ELEV M42.00 OUTLET BLEV 5475 N/AT COON

HAUNCH DETAIL 2 #4 CONTINUOUS 6x6-10/0 W.WM 4 CONG. SLAD 4 ML POLYETHYLENE 6" ROD 11/2-1-03 J ات ONETIC NORTH & CALLED NORTH 15 ROW-

24-0 17-5 J-S 03 24 15-5 9-0 STEP FTG 8POURED CONC WALL -5X CONC PT6 W/24 (TYP) DEPRESSION WALL FOR HAUNCH A STEP PT6 UNEXCAVATED E COMPTO LXXV CON W/HIA WAY st XX 8-0 STEP TOR WALL SIL

IT-5 J-a f I LOVE PTO TEXT-EX CONC PT6 N/A WAY USDWT STL co W/DXBYUSOF 10 POURED CONG (TYP) 1 X 10 CONC PTO W/3-14 (TYP) b UNEXCAVATED STEP PTO X-r Endir STEP TOP OF WALL 11 POST attte IF THE CONC MAN SUT S MT ST ca w XXIDA -1511-51 CONC TẢI NHA ĐA LÀ NHÀ UNEXCAVATED & caetus bove] STEP TOP OF WALL STEP FTO 14-5 HV 5TH CONC MANCH 5-0 STOP PT6 N 10-0 STEP TOP OF WALL STEP FTO A CONE GLAD, ELEV. 197 W/6x6-10/0 www. 1-511-5X CONC PTG W/44 A WAY UT STP MY SL ca w/XX VIDE FOR STL ca & FOX DA FRANGONTR DAY SEE DETAL-F 1-6X16X CONC PTG W/A HEA WAY - U STP WESTL ·ca W/B XBVION STEP TO STEP TOP OF WAL CONG FUK-TOP OF WALL TO DELOW STAR (RE DONT FLA FOR DECK FOOT SEE DETAILS HAN K-F Wie POST 16-5 J-M € POST EPOST

an EARTH BACKFILL (OVERFILL) FILTER FABRIC 4" PERF. PIPE (1/16" PITCH) 3/4"-1/2" CRUSHED STONE ZI 3'-0" TILE FIELD DETAIL 1/2" = 10 t (MIN. DIM.) 2 1