A roadway is to be built through the mountains cutting slopes and stabilizing them. Soil sample was taken out from top of the mountains for various physical and mechanical testing. Condition of the initial soil sample obtained through boring is given in the figure below, 9 20 16 8 7 XXI a 15 30
6 ² | ³ |- |- |-·| ²³ | ZAK 30 70
A roadway is to be built through the mountains cutting slopes and stabilizing them. Soil sample was taken out from top o
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
A roadway is to be built through the mountains cutting slopes and stabilizing them. Soil sample was taken out from top o
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!