The construction of a swimming pool required the tasks shown in the table below: Task Time (days) A Prepare the area for

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

The construction of a swimming pool required the tasks shown in the table below: Task Time (days) A Prepare the area for

Post by answerhappygod »

The Construction Of A Swimming Pool Required The Tasks Shown In The Table Below Task Time Days A Prepare The Area For 1
The Construction Of A Swimming Pool Required The Tasks Shown In The Table Below Task Time Days A Prepare The Area For 1 (41.16 KiB) Viewed 34 times
The construction of a swimming pool required the tasks shown in the table below: Task Time (days) A Prepare the area for the pool 1 B Mix the concrete 0.5 C Lay the concrete 1 D Let the concrete dry E Purchase the tiles for the pool F Tile the pool 1 ? G Let the tiles dry H Fill the pool with water a) Construct a precedence table by copying and pasting the table below, and fill in column 4 (last column) with the correct prerequisites. (5 marks) b) Use the illustration tool to draw a precedence network for this project. (7 marks) b) Identify the critical path for the project. (1 mark) c) Find the minimum completion time for the project. (1 mark) 2 1 2 Prerequisites ? ? ? ? ?