- 15m Innen To 5m If The Permeability Of The Soil Is 2x10 3 M Day Calculate The Flow Through The Dam O A 10x10 3 M3 Day 1 (194.42 KiB) Viewed 29 times
15m innen TO 5m If the permeability of the soil is 2x10-3 m/day, calculate the flow through the dam O a. 10x10-3 m3/day
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
15m innen TO 5m If the permeability of the soil is 2x10-3 m/day, calculate the flow through the dam O a. 10x10-3 m3/day
15m innen TO 5m If the permeability of the soil is 2x10-3 m/day, calculate the flow through the dam O a. 10x10-3 m3/day per unit length O b. 30x10-3 m3/day per unit length O c. 25x10-3 m3/day per unit length O d. 40x10-3 m3/day per unit length P