Question 2 (30 marks) A 35 000 m³ volume building for a chemical manufacturing facility requires three air changes per h

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Question 2 (30 marks) A 35 000 m³ volume building for a chemical manufacturing facility requires three air changes per h

Post by answerhappygod »

Question 2 30 Marks A 35 000 M Volume Building For A Chemical Manufacturing Facility Requires Three Air Changes Per H 1
Question 2 30 Marks A 35 000 M Volume Building For A Chemical Manufacturing Facility Requires Three Air Changes Per H 1 (28.47 KiB) Viewed 34 times
Question 2 (30 marks) A 35 000 m³ volume building for a chemical manufacturing facility requires three air changes per hour. The air in the building is to be maintained at a temperature of 22°C and relative humidity of 65 per cent. The external air is saturated and at a temperature of 6 °C. Determine (a) Volume of saturated air at 6 °C required to be pumped into the building per hour. (b) mass of water in kg/h to be added to the air to maintain the required humidity at 22°C (assume water is supplied at 6°C) (c) Heat transfer required by the dry air in MJ/h to produce the required temperature of 22°C. (d) Heat transfer required by the combined water vapor in the air and the extra water needed in MJ/h. Take C, for superheated steam as 2.0934 kJ/kg K.