Experimental procedure Once either the orifice or nozzle has been fitted in the measuring object, it is installed in mea

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Experimental procedure Once either the orifice or nozzle has been fitted in the measuring object, it is installed in mea

Post by answerhappygod »

Experimental Procedure Once Either The Orifice Or Nozzle Has Been Fitted In The Measuring Object It Is Installed In Mea 1
Experimental Procedure Once Either The Orifice Or Nozzle Has Been Fitted In The Measuring Object It Is Installed In Mea 1 (38.89 KiB) Viewed 29 times
Experimental procedure Once either the orifice or nozzle has been fitted in the measuring object, it is installed in measuring section VI NOTICE Ensure the correct direction of flow. When installing the measuring objects, it must be ensured that the sealing rings are properly fitted in the groove. Union nuts should only be hand tight. The pressure gauge is connected as described in Chapter 5.2.1, Page 59. The volumetric flow is set using the shut-off valve in the measuring section (head loss). NOTICE The measuring connections on the measuring object are used, not those on the measuring sec- tion. Experiment 3 Nozzle measurement: pin kg/m³ 4pin mbar V in U/min Vin Vmin measured calculated 998,2 1 998,2 1 1 Variance in %
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply