22 Medro will use the project network diagram shown (activity times are in weeks) to start a summer camp for children. H
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
22 Medro will use the project network diagram shown (activity times are in weeks) to start a summer camp for children. H
21 Medro sat down and thought about his daily capacity for making mini cheesecakes during the first few months of opening. He believes the design capacity for making mini cheesecakes will equal to 120 cakes/day and the effective capacity will equal to 100 cakes/day. If he believes that the system utilization will be 80%, what will the system efficiency be equal to? (6 Points) a. 80% b. 96% c. 100% d. not enough information to solve e. none of the above
20 Medro's labor productivity last week was 20 sandwiches/hour. This week it was 25 sandwiches/hour. What was the growth rate? (6 Points) The table below shows the number of units Medro thinks he can sell in a week for coffee drinks, sandwiches, and cheesecakes. Coffee Drinks Sold Sandwiches Sold Cheesecakes Sold 400 800 200 The number of employees required to produce each output is shown below: Coffee drinks Sandwiches Cheesecakes 7 employees. 6 employees 3 employees The selling price for each output is shown below: Coffee drinks Sandwiches Cheesecakes 2 KD/unit 4 KD/unit 3 KD/unit The labor cost for each employee is 200 KD/week Overhead cost = 2x(the total labor cost) a. 5% b. 20% c. 25% d. none of the above