A firm wants to build mini hydro power plant and "pumped storage hydroelectricity system" for a river as seen on the rig

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A firm wants to build mini hydro power plant and "pumped storage hydroelectricity system" for a river as seen on the rig

Post by answerhappygod »

A Firm Wants To Build Mini Hydro Power Plant And Pumped Storage Hydroelectricity System For A River As Seen On The Rig 1
A Firm Wants To Build Mini Hydro Power Plant And Pumped Storage Hydroelectricity System For A River As Seen On The Rig 1 (81.43 KiB) Viewed 12 times
A firm wants to build mini hydro power plant and "pumped storage hydroelectricity system" for a river as seen on the right sketch. Therefore, they want to calculate the total heads in both systems. The detailed systems are shown below for both cases. Flowrate is assume 100 l/s for both cases. The pipes are build from Carbon Steel (Cement- lined). Calculate the turbine net head for the given system. Gross head is 15 m for this system. - 17 m- - 4 m. water temp. 20°C SUSPEN control valve *59 bend 90° - 5 m - -12 m #F √²79 Steel pipe NB 250 mm bend 45° LINE bend 25° -59 A -17. SASSISTENIMESTENSTREMENSTMENSTREISTASS Steel pipe NB 225 mm
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply