- 1 A Contract Document Set Consists Of 2 The Shop Drawings Are Prepared By The A Architect B Structural Engineer C 1 (70.99 KiB) Viewed 44 times
1. A contract document set consists of: 2. The shop drawings are prepared by the a) architect. b) structural engineer. c
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
1. A contract document set consists of: 2. The shop drawings are prepared by the a) architect. b) structural engineer. c
1. A contract document set consists of: 2. The shop drawings are prepared by the a) architect. b) structural engineer. c) mechanical engineer. d) general contractor. e) none of the above. 3. Shop drawings are generally reviewed by the a) architect. b) concerned engineering consultant. c) general contractor. d) all of the above 4. The final completion inspection of the project is generally conducted by the e) architect. f) structural engineer. g) general contractor. h) architect with the help of his or her consultants. i) local jurisdiction. a) construction drawings and specifications. b) construction drawings and a project manual. c) specifications and a project manual. d) specifications and bidding documents.