It is desired to develop the geothermal potential of a certain area by the installation of a 20 MW steam turbo-generator

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

It is desired to develop the geothermal potential of a certain area by the installation of a 20 MW steam turbo-generator

Post by answerhappygod »

It is desired to develop the geothermal
potential of a certain area by the installation of a 20 MW steam
turbo-generator using a back pressure turbine preliminary
investigation showed that the area has sufficient steam capacity to
produce the required power capacity the manufacturer data for their
turbine are as follows:
1.0) Throttle Pressure
1.7 MPag Steam w/ 2% wet
2.0) Back Pressure
51 mm- Hg vacuum
3.0) Geothermal Turbine Eff.
75%
4.0) Mechanical-Electrical
Eff. 94%
If the barometer in the area averages 750 mm-Hg
abs. and production wells have each a capacity of 5000 kg/hr with a
reinjection rate of 10 % in the steam drum. Determine the number of
steam wells required for this installation?