Problem 7 [12 points total] Two possible routes for a power line are under study. Data on the routes are as follows: Aro

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Problem 7 [12 points total] Two possible routes for a power line are under study. Data on the routes are as follows: Aro

Post by answerhappygod »

Problem 7 12 Points Total Two Possible Routes For A Power Line Are Under Study Data On The Routes Are As Follows Aro 1
Problem 7 12 Points Total Two Possible Routes For A Power Line Are Under Study Data On The Routes Are As Follows Aro 1 (191.37 KiB) Viewed 13 times
Problem 7 [12 points total] Two possible routes for a power line are under study. Data on the routes are as follows: Around the lake Under the lake 4 km 15 km Length First cost $5000/km $25,000/km Annual maintenance $200/km $300/km Useful life in years 18 12 Salvage value $3000/km $5000/km Annual power loss / km $500/km $500/km If the MARR is 7% annual effective, explain how you would decide between these two alternatives (remember to draw cash flow diagrams).
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply