A new highway is to be constructed. Design A calls for a concrete pavement costing ​$70 per foot with a 20​-year ​life;

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A new highway is to be constructed. Design A calls for a concrete pavement costing ​$70 per foot with a 20​-year ​life;

Post by answerhappygod »

A new highway is to be constructed. Design A calls for a
concrete pavement costing ​$70 per foot with a 20​-year ​life; four
paved ditches costing ​$5 per foot​ each; and our box culverts
every​ mile, each costing ​$7,000 and having a 20​-year life.
Annual maintenance will cost ​$1,900 per​ mile; the culverts
must be cleaned every five years at a cost of ​$400 each per mile.
Design B calls for a bituminous pavement costing ​$55 per foot with
a 10​-year life; two sodded ditches costing ​$1.55 per
foot​ each; and four pipe culverts every​ mile, each
costing ​$2,100 and having a 10​-year life. The replacement
culverts will cost $2,350 each. Annual maintenance will cost
​$2,800 per​ mile; the culverts must be cleaned yearly at a
cost of ​$225 each per​ mile; and the annual ditch maintenance
will cost ​$1.30 per foot per ditch. Compare the two designs on the
basis of equivalent worth per mile for a 20​-year period. Find the
most economical design on the basis of AW and PW if the MARR is
10​% per year
The AW value for Design A is
The PW value for Design A is
The AW value for Design B is
The PW value for Design B is