Two electric motors (A and B) are being considered to drive a centrifugal pump. Each motor is capable of delivering 50 h

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Two electric motors (A and B) are being considered to drive a centrifugal pump. Each motor is capable of delivering 50 h

Post by answerhappygod »

Two Electric Motors A And B Are Being Considered To Drive A Centrifugal Pump Each Motor Is Capable Of Delivering 50 H 1
Two Electric Motors A And B Are Being Considered To Drive A Centrifugal Pump Each Motor Is Capable Of Delivering 50 H 1 (195.29 KiB) Viewed 18 times
Two electric motors (A and B) are being considered to drive a centrifugal pump. Each motor is capable of delivering 50 horsepower (output) to the pumping operation. It is expected that the motors will be in use 1,100 hours per year. If electricity costs $0.09 per kilowatt-hour and 1 hp = 0.746 kW, which motor should be selected if MARR = 10% per year? Refer to the data below. Motor B Motor A $1,500 0.83 $700 0.71 Initial Cost Electrical Efficiency Annual Maintenance Life $55 $100 5 years 5 years
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply