- A New Highway Is To Be Constructed Design A Calls For A Concrete Pavement Costing 90 Per Foot With A 12 Year Life Two 1 (18.03 KiB) Viewed 13 times
A new highway is to be constructed. Design A calls for a concrete pavement costing $90 per foot with a 12-year life; two
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
A new highway is to be constructed. Design A calls for a concrete pavement costing $90 per foot with a 12-year life; two
A new highway is to be constructed. Design A calls for a concrete pavement costing $90 per foot with a 12-year life; two paved ditches costing $4 per foot each; and two box culverts every mile, each costing $7,000 and having a 12-year life. Annual maintenance will cost $1,700 per mile; the culverts must be cleaned every three years at a cost of $550 each per mile. Design B calls for a bituminous pavement costing $40 per foot with a 6-year life; three sodded ditches costing $1.50 per foot each; and three pipe culverts every mile, each costing $2,100 and having a 6-year life. The replacement culverts will cost $2,350 each. Annual maintenance will cost $2,600 per mile; the culverts must be cleaned yearly at a cost of $230 each per mile; and the annual ditch maintenance will cost $1.30 per foot per ditch. Compare the two designs on the basis of equivalent worth per mile for a 12-year period. Find the most economical design on the basis of AW and PW if the MARR is 6% per year. Click the icon to view the interest and annuity table for discrete compounding when the MARR is 6% The AW value for Design A is $/mi. (Round to the nearest hundreds.)