Question 4 Dundee Precious Metal Tsumeb (DPMT) copper smelter is working on a slurry pumping system design. In this case

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Question 4 Dundee Precious Metal Tsumeb (DPMT) copper smelter is working on a slurry pumping system design. In this case

Post by answerhappygod »

Question 4
Dundee Precious Metal Tsumeb (DPMT) copper smelter is working on a slurry pumping system design. In this case, a pump is fed with two streams of a slurry. Stream 1 has a slurry at a flowrate of 5.0m³/h and the pulp contains 40% solids by weight. Stream 2 has a pulp volumetric flowrate of 3.4m³/h and it has 55% solids by weight. As a design engineer for the slurry pumping system, calculate the tonnage of dry solids pumped per hour.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply