A certain project requires a total volume of concrete equal to 2 000 m3 and requires. Determine the total cost to comple

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A certain project requires a total volume of concrete equal to 2 000 m3 and requires. Determine the total cost to comple

Post by answerhappygod »

A certain project requires a total volume of concrete equal to 2 000 m3 and requires.
Determine the total cost to complete the (per. cu.m.) of this project.
A Certain Project Requires A Total Volume Of Concrete Equal To 2 000 M3 And Requires Determine The Total Cost To Comple 1
A Certain Project Requires A Total Volume Of Concrete Equal To 2 000 M3 And Requires Determine The Total Cost To Comple 1 (34.33 KiB) Viewed 16 times
4. A certain project requires a total volume of concrete equal to 2 000 m³ and requires: Item Description Rates Concrete pump Php. 3,000/hr rental Pump rated working output 100 m³/day Working hours of pump 8 hrs/day 1 Operator Php. 85/hr 2 Finishing Masons Php. 65/hr each 4 Carpenters Php. 60/hr each 6 Laborers Php. 50/hr each Determine the total cost to complete the project and calculate the unit cost (per. cu.m.) of this project. (20 pts)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply