Page 1 of 1

Figure 2 below presents the set of stairs with quarter landings forming part of new hotel in Johannesburg suburb. 25 mm

Posted: Fri May 27, 2022 7:16 am
by answerhappygod
Figure 2 Below Presents The Set Of Stairs With Quarter Landings Forming Part Of New Hotel In Johannesburg Suburb 25 Mm 1
Figure 2 Below Presents The Set Of Stairs With Quarter Landings Forming Part Of New Hotel In Johannesburg Suburb 25 Mm 1 (115.54 KiB) Viewed 19 times
can I please get assisted
Figure 2 below presents the set of stairs with quarter landings forming part of new hotel in Johannesburg suburb. 25 mm clay floor tiles with screed will be used as finishes on the stairs. The stairway is 1.4 m wide, consisting of 250 mm treads and 200 mm risers. The landings and the waist have the same thickness of 175 mm. The total rise is 1.2 m and use concrete class 25 with mild exposure conditions. Assume Y12 main bars, Fcu = 25 MPa, Fy = 450 MPa and cover (c) = 16 mm and the deflection is ok (Thus no need to check). Please, use the above details to answer the following questions related to the stairs of 4.3 m span: a. Represent the loading on the stairs. (2) b. Calculate the design load at Ultimate Limit State (ULS) for the stairs. c. Design for shear reinforcement. (15) (3) 1.4 m Span-3.550 m + 8 x 250-2.0 m 300 x 300 mm column Up Quarter landing S Quarter landing Span= 4.3 m 1.4 m 1.5 m 6 x 250 fl Lift shaft ————— ************* Figure 2: Layout of stairs Beam 300 mm wide Floor level Up quibusl 300 x 300 mm column