- 240 Kn 1 5 X 3 M Elevation 205 M Ydry 17 5 Kn Mo W 20 Elevation 204 M Fill Ysar 18 Kn M Clayey Soil Elevation 200 M Gs 1 (43.43 KiB) Viewed 27 times
240 KN 1.5 x 3 m Elevation 205 m Ydry=17.5 kN/mº; w=20% Elevation 204 m Fill Ysar=18 kN/m Clayey soil Elevation 200 m Gs
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
240 KN 1.5 x 3 m Elevation 205 m Ydry=17.5 kN/mº; w=20% Elevation 204 m Fill Ysar=18 kN/m Clayey soil Elevation 200 m Gs
240 KN 1.5 x 3 m Elevation 205 m Ydry=17.5 kN/mº; w=20% Elevation 204 m Fill Ysar=18 kN/m Clayey soil Elevation 200 m Gs=2.65; w=10%; e=0.8 Elevation 199 m Sandy soil Use to the 2:1 method to determine the increase in stress in the mid-layer of the clayey soil layer due to the construction of the foundation shown. The specifications require the increase to be limited to 5 kPa. Is this requirement satisfied? If not, provide a detailed solution.