Form-work is needed for an 8-ft high concrete wall. The concrete will be internally vibrated and poured at a rate of 8.5

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Form-work is needed for an 8-ft high concrete wall. The concrete will be internally vibrated and poured at a rate of 8.5

Post by answerhappygod »

Form Work Is Needed For An 8 Ft High Concrete Wall The Concrete Will Be Internally Vibrated And Poured At A Rate Of 8 5 1
Form Work Is Needed For An 8 Ft High Concrete Wall The Concrete Will Be Internally Vibrated And Poured At A Rate Of 8 5 1 (28.17 KiB) Viewed 10 times
Form-work is needed for an 8-ft high concrete wall. The concrete will be internally vibrated and poured at a rate of 8.5 ft/h, at a temperature of 95° F. The sheathing will be Class 1 Plywood, 4x8 sheets, %-inch thick. The studs and double wales will be 2 x 4 Douglas Fir, with the following properties: Fb = 1910 psi Fv = 110 psi FC1 = 455 psi E = 1.7 X106 psi The deflection must not exceed L/240. Assuming that the stud spacing, as calculated is 12 inches, determine the design load and the spacing of the wales.